  4. Requirements Document Template: Examples, Acceptance Criteria, and Change Log

Requirements Document Template: Examples, Acceptance Criteria, and Change Log

要件定義書テンプレート|Web・システム発注で使えるサンプルと書き方

Published: 08/03/2026

Last Updated: 10/10/2026

Category: Marketing DX, Marketing Strategy

Authors: Shusaku Yosa

Ready to put this into practice?

Start Xtrategy for free→

1-minute signup, free, cancel anytime

A requirements document helps stakeholders judge the necessary work and its completion conditions in the same terms. Headings alone are insufficient when entries say only “user-friendly” or “migrate existing data.” Connect required behavior, conditions, verification, ownership, and evidence through requirement IDs. Keep undecided items visibly undecided. The screens, volumes, and performance values below are fictional examples.

The role of requirements: RFPs, design, and contract documents

An RFP seeks comparable proposals; requirements turn needs and constraints into stakeholder agreements. Design develops the implementation, but technical constraints such as supported environments or existing-system connections may themselves be requirements. The distinction between what and how is useful, not an absolute prohibition on technical conditions.

IPA’s explanation of requirements definition describes analyzing user needs and reaching agreement. Requirements may develop before supplier selection or continue afterward; there is no single sequence that starts only after contracting.

Regardless of who drafts, allocate reviews of business need, technical feasibility, and verification methods. Ask for unfamiliar wording to be explained through capability and limits. Do not sign off while technical feasibility remains nobody’s responsibility.

IPA’s model transaction and contract materials provide a reference on documents and responsibilities. Actual contractual scope and precedence require agreement between the parties; presence or absence of one row does not alone settle legal responsibility.

A seven-section outline and a copyable requirements table

Use these seven sections as a starting point. For an inapplicable topic, decide whether it is unnecessary or addressed elsewhere. Choose the detail needed for agreement and verification rather than a supposedly standard page count.

Section

Contents

Traceable reference

1 Overview

Purpose, scope, exclusions, assumptions, approvers

Scope and decisions

2 Business

Users and current / future workflow

Workflow and roles

3 Functional

Required operations and behavior

Requirement and test IDs

4 Screens

Display, inputs, navigation, errors

Screen inventory and checks

5 Data

Meaning, transfer, retention

Definitions and migration population

6 Non-functional

Performance, security, availability, environments

Measurement and operating conditions

7 Migration and operation

Move, stop, recover, operate

URL map, procedures, handover

The requirements table should include ID, user or rationale, behavior and conditions, priority, acceptance criteria, verification method and test ID, responsible reviewer, evidence, and version or status. Use a separate matrix when one requirement maps to several tests. A goal such as increasing inquiries from 30 to 60 monthly belongs in the business background, not as an outcome guaranteed by system delivery alone.

Testable functional and non-functional examples

Requirement / rationale

Required behavior or condition

Acceptance and test

Owner / evidence / status

F-01 / separate editing and approval

Editors save drafts; approvers publish the approved version

T-01: editor cannot publish. T-02: approver can publish the specified version

Business and technical reviewers / operations and version record / v1 pending

D-01 / preserve information

Migrate the agreed 480 articles

Reconcile IDs, text, images, publication state, and mapped URLs

Migration owner / differences and review records / v1 test pending

N-01 / search response

Environment v1, agreed 10,000-record dataset, 100 concurrent users, 10-minute load test

Response-time p95 at most 800 ms for the agreed measurement population; error criterion remains TBD-02

Technical owner / script version, environment, logs / final acceptance held

For F-01, test prohibited actions as well as permitted ones. Identify role, version, and the distinction between saving and publishing. Add necessary error, permission, and retry cases. A number or feature name does not make a requirement testable by itself.

The 10,000 records, 100 concurrent users, ten minutes, and 800 ms are fictional, not recommended defaults. p95 is the 95th percentile of the measured response times. Fix the timing boundary, success and failure treatment, load pattern, data, cache, repeat runs, and environment. Do not grant final acceptance while the error-rate criterion remains undecided.

For clear, feasible, verifiable requirements and verification matrices, see NASA’s Systems Engineering Handbook appendices. This is a reference from another domain, not a source prescribing these performance numbers or Japanese contract terms.

Google’s explanation of LCP distinguishes the largest contentful paint from complete page loading. Its good threshold of 2.5 seconds or less concerns the 75th percentile of real-user observations, assessed by device category. It is not a promise that every page fully loads within 2.5 seconds over 4G. Keep laboratory checks and field evaluation separate.

Migration, legacy URLs, and post-launch operations

D-01 does not pass merely because the destination contains 480 articles. Reconcile target IDs, text, images, publication states, and mapped URLs, and define the treatment of excluded content. Separate full-population checks from sample content checks, recording sample selection and its limits.

Legacy URL

Content decision

Response or destination

Verification

/service/

Retain at the same URL

200 and self-referencing canonical

Content and internal links

/old/service-a

Move equivalent content

301 or 308 to /service-a

Final URL, content, new canonical

/old/guide-a and /old/guide-b

Consolidate related content

301 or 308 to relevant combined page

Preserve both information needs

/old/expired-event

Retire without relevant replacement

404 or 410

No blanket redirect to unrelated homepage

Google Search Central’s site-move guide explains relevant permanent redirects and 404/410 for removed content without a replacement. Do not turn blanket homepage redirection into a generic requirement.

Migration requirements also cover cleanup, incremental updates, stopping the old environment, recovery, and the operating owner. Consider data received after launch when planning rollback. Agree relevant backup, access, retention, and accessibility topics with the appropriate specialists.

Buyer and technical reviews, and acceptance checks

Business reviewers check user context, information, roles, and exclusions. Technical reviewers check feasibility, dependencies, permissions, performance, security, and test methods. Involve operations, information governance, or accessibility expertise where needed. A short checklist is an entry point, not a completeness guarantee.

Acceptance records should identify the version, environment, data, procedure, expected and actual results, evidence, and reviewer. Distinguish pass, untested, fail, and any conditional treatment. Conditional progress needs remaining conditions, a deadline, and an authorized decision. Untested is not passed.

When a mismatch appears, distinguish misunderstanding, implementation defect, missing requirement, and new scope. Do not automatically assign undocumented work to the buyer. Check the underlying agreement, proposal, and contract references, and avoid requiring a single operational contact to make every specialist judgment.

Manage open decisions and approved changes

ID / version

Open question or change

Decision owner / timing

Impact and status

Related requirements

TBD-01 / v1

Supported browser range

Buyer owner and technical lead / before it becomes a design premise

Environment and test population / open

N-02

TBD-02 / v1

Load-test error acceptance criterion

Both technical leads / before acceptance tests are fixed

Performance evaluation and final acceptance / open

N-01

CR-02 / v1

Change single approval to multiple stages

Authorized parties / after revised estimate review

Reassess effort, tests, dates / awaiting approval

F-01, T-01, T-02

For each unknown, state what decision enables which next activity. If proceeding on an assumption, share the consequences if it proves wrong and a review date. Escalate missed decision dates with their downstream effects.

For changes, retain the reason, affected requirements, cost, dates, dependencies, acceptance method, estimate, and decision. Changes need not always occur, but a process does not remove commercial negotiation or authorization when they do. Keep the previous baseline and revision history; update the current version only with adopted conditions. Start with three important requirements and fill in behavior, verification, evidence, and owner. Visible unknowns are more useful than invented certainty.

For the next step, use How to Write an RFP: A Filled Example with Mandatory Criteria and a Scoring Sheet; Website Redesign Planning: Phases, a URL Migration Map, and Launch Checks; How to Write a Creative Brief: A Filled Example for the Problem, Audience, and Budget.

 

 

 

 

Table of Contents

  1. The role of requirements: RFPs, design, and contract documents
  2. A seven-section outline and a copyable requirements table
  3. Testable functional and non-functional examples
  4. Migration, legacy URLs, and post-launch operations
  5. Buyer and technical reviews, and acceptance checks
  6. Manage open decisions and approved changes

 

Company

  • Company
  • Company overview
  • Mission · Vision · Values
  • Guidelines

Services

  • Services

Blog

  • Blog
  • Categories
  • Authors

Estimate

  • Estimate simulator

Careers

  • Careers
  • Culture & Work Style
  • Benefits & Systems
  • Hiring Process
  • FAQ
  • Open Positions

Policies

  • Privacy Policy
  • Anti-Social Policy
  • Information Security Policy

Contact

  • Contact

Social

  • X
  • LinkedIn
  • Facebook
  • Pinterest
© 2026 Ficilcom Inc.

Related Articles

サイトリニューアルの進め方|要件定義から公開までの工程とチェックリスト
Marketing DX07/27/2026

Website Redesign Planning: Phases, a URL Migration Map, and Launch Checks

Plan a website redesign with scope decisions, phase gates, a filled URL migration map, launch tests and recovery conditi...

Shusaku YosaRead more
制作進行管理のやり方|「誰が今どこで止まっているか」を可視化する仕組み
Marketing DX07/23/2026

Creative Production Workflow: Track Stages, Next Owners, and Waiting Time

Track creative work through stages, handovers, rework, and approvals. Includes copyable tables that separate the produce...

Shusaku YosaRead more
2025年の崖をわかりやすく解説|何が問題か、何をすべきか
Marketing DX07/13/2026

Japan’s 2025 Digital Cliff: Legacy-System Priorities for 2026

Separate Japan’s 2018 digital-cliff warning from current evidence. Use a practical inventory and execution worksheet to ...

Shusaku YosaRead more