FICILCOM Inc. LogoFICILCOM Inc.
  • Company
  • Company Overview
  • Mission · Vision · Values
  • Guidelines
  • Services
  • NeX-Ray
  • Xtrategy
  • Trial Job Change
  • Tsurugi
  • Recruit
  • Culture
  • Benefits
  • Process
  • FAQ
  • Open Positions
Contact
  1. Home
  2. Blog
  3. Trial Job Change
  4. Introducing Trial Day Placements: A Guide for Employers on Design, Pay and Contracts

Introducing Trial Day Placements: A Guide for Employers on Design, Pay and Contracts

体験入社を導入する企業向けガイド|設計手順・報酬・契約・採用ミスマッチ対策

Published: 08/28/2026

Last Updated: 08/28/2026

Category: Trial Job Change, Work Styles

Authors: Shusaku Yosa

Ready to put this into practice?

Start おためし転職 for free→

1-minute signup, free, cancel anytime

When introducing a trial day placement scheme, the first thing to settle is whether participants will perform actual work or simply observe. Starting out with that line left vague leads to problems later over whether payment is owed and whether workers' accident insurance applies.

This article is written for hiring teams, setting out how to design a trial placement scheme and the contractual points to watch under Japanese employment law.

Decide the Purpose Before the Design

Before designing the scheme, fix what problem you are trying to solve. The right design differs according to the answer.

  • Reducing early attrition: If the cause is a gap that emerges after joining, participants need to experience something close to the real work.
  • Widening the applicant pool: You need to lower the barrier to taking part, which favours a short, observation-oriented format.
  • Improving selection accuracy: Assessment is involved, so the criteria and how feedback is delivered must be settled in advance.

The Critical Point: Observation Versus Work

This is the single most important consideration in the design. Where a participant performs work under the company's direction and that work contributes to the company's benefit, the arrangement can be treated as employment in substance, whatever it is called. In that event an obligation to pay wages arises, and minimum wage applies.

Three indicators guide the assessment.

  1. Whether you give instructions about what to do and how to do it
  2. Whether the participant is bound as to time and place
  3. Whether the output is used directly in the business

If these apply, the safe design is a short-term employment contract with wages paid. Processing the arrangement as a service contract or an unpaid internship leaves you exposed to a later claim for unpaid wages.

Accident Insurance Follows the Same Line

Workers' accident compensation insurance covers workers. If you keep the placement to observation, a participant who trips and injures themselves is not covered. On sites carrying physical risk, such as factories and warehouses, decide in advance whether to structure the placement as employment or to arrange separate accident cover.

Design Steps

  1. Decide the target roles and the duration: Half a day to several days is typical. Longer placements raise the barrier to participation.
  2. Settle observation or work: If work, fix the contract form and the level of payment first.
  3. Name the receiving team and the responsible person: Starting without estimating the load on the team leaves them carrying it, and the scheme will not last.
  4. Define what participants may see, and handle confidentiality: Agree access to client and non-public information in advance, and exchange a written undertaking.
  5. Decide what happens afterwards: Tell participants before they take part whether this leads into the selection process or whether a separate application is required.

Setting the Payment

Where the placement is structured as work, benchmarking payment against what your own employees doing the same work earn is the natural approach. A figure that is too low is not only a minimum wage question: it directly worsens the impression participants form of your company. Stating up front who covers travel and meals also prevents friction later.

How It Works Against Hiring Mismatches

Interviews and paperwork leave neither side able to see the other clearly. Most early attrition stems not from inadequate ability but from a gap between the role the employer had in mind and where the individual's strengths actually lie. A trial placement is a way of surfacing that gap before anyone joins.

To get that benefit, though, you have to show more than the good parts. Concealing what peak season really looks like, or the unglamorous tasks, only produces a larger gap after the person joins.

Common Questions About Introducing a Scheme

Can we run it unpaid?

Yes, if you keep it to observation. Where participants perform actual work, design the scheme on the basis that payment is made. Where the boundary is fine, choosing to pay carries the lower risk.

Can people currently in work take part?

It depends on the side-work rules at their current employer. Where the design involves payment, telling participants they need to check their own position avoids trouble. If you want to reach people who cannot attend on weekdays, weekend slots are worth considering.

Can we assess participants as part of selection?

You can, but say in advance whether you will or not. Presenting the placement as a chance for mutual understanding while in fact running a selection exercise damages participants' trust.

Summary: Fix the Contract Form First

The first thing to settle when introducing a trial placement is not the content but the line between observation and work. Once that is fixed, the decisions on payment, accident cover and contractual paperwork follow automatically. Leave it vague and the cost of correcting course later rises sharply.

This article sets out general principles of scheme design under Japanese law. Whether someone qualifies as a worker is assessed on the substance of the arrangement, and conclusions vary with the individual facts. Before introducing a scheme, consult a qualified professional such as a lawyer or a certified social insurance and labour consultant.

 

 

 

 

Table of Contents

  1. Decide the Purpose Before the Design
  2. The Critical Point: Observation Versus Work
  3. Design Steps
  4. Setting the Payment
  5. How It Works Against Hiring Mismatches
  6. Common Questions About Introducing a Scheme
  7. Summary: Fix the Contract Form First

 

Company

  • Company
  • Company overview
  • Mission · Vision · Values
  • Guidelines

Services

  • Services

Blog

  • Blog
  • Categories
  • Authors

Estimate

  • Estimate simulator

Careers

  • Careers
  • Culture & Work Style
  • Benefits & Systems
  • Hiring Process
  • FAQ
  • Open Positions

Policies

  • Privacy Policy
  • Anti-Social Policy
  • Information Security Policy

Contact

  • Contact

Social

  • X
  • LinkedIn
  • Facebook
  • Pinterest
© 2026 Ficilcom Inc.

Related Articles

人事評価に納得できずやる気が出ないときの対処法|面談・異議・転職判断
Work Styles09/21/2026

What to Do When You Disagree with Your Performance Review and Lose Motivation | Meetings, Appeals, and Job-Change Criteria

How to handle a performance review you cannot accept. Check the system, how to speak in the meeting, how to appeal, and ...

Shusaku YosaRead more
離職率が高い会社は危険?見分け方・調べ方・入社前に確認する質問
Work Styles09/21/2026

Is a High-Turnover Company Dangerous? How to Spot Risk, Research It, and Questions to Ask Before Joining

Does high turnover mean a company is dangerous? How to read the number, how to research it, questions to ask before join...

Shusaku YosaRead more
人事異動に納得できないときは辞めるべき?拒否・相談・転職の判断基準
Work Styles09/21/2026

Should You Quit If You Disagree with a Transfer? Refusal, Consultation, and Job-Change Criteria

Can you refuse a personnel transfer in Japan? This article covers when refusal or negotiation is possible, how to consul...

Shusaku YosaRead more